Bengaluru Metro Pink Line cost doubles from ₹8,730 crore to ₹17,346 crore
The estimated cost of the Bengaluru Metro Pink Line project has increased from ₹8,730 crore to ₹17,346 crore. The Pink Line, connecting the city's south to north, is 21.26 km long, with 13.76 km being underground and 7.5 km elevated. The project, originally expected to be completed in 2016, is now expected to be completed in 2027.
Originally reported by TV9 Kannada
Summarised from the source’s public news feed without altering the facts. Read the original report for the full story.
BengaluruMetroPink LineInfrastructureCost Increase

