BLR Today
Friday, 30 October 2026Local news from Bengaluru, neighbourhood by neighbourhood

B-SMILE to re-tender two major elevated corridor projects with reduced estimated cost

B-SMILE to re-tender two major elevated corridor projects with reduced estimated cost
Image: Asianet Suvarna News

Bengaluru Smart Infrastructure Limited (B-SMILE) has re-tendered two major elevated corridor projects, revising the estimated cost to address the city's traffic issues. The revised tenders cover corridors from 'Minerva Circle to Hudson Circle' and 'Shoolé Circle to Saint John's Hospital Road'. The estimated cost for the first corridor was reduced from ₹540 crore to ₹511.4 crore, and the second was lowered from ₹564 crore to ₹515 crore.

Originally reported by Asianet Suvarna News Summarised from the source’s public news feed without altering the facts. Read the original report for the full story.
BengaluruInfrastructureB-SMILEElevated CorridorTraffic Management