Railway requests 33-day closure for Hennur-Bagalur main road construction
South Railway has requested permission from Bengaluru Traffic Police to close the Hennur-Bagalur main road for 33 days, from November 28 to December 30. This closure is required for the widening of Railway Overbridge No. 535 at Geddalahalli. The current 9.5-meter wide road will be expanded to 18 meters, involving the construction of two-door, 9-meter reinforced cement concrete box structures. The project has been awarded to 'Founder in Fratec,' a Bengaluru-based firm.
Originally reported by Asianet Suvarna News
Summarised from the source’s public news feed without altering the facts. Read the original report for the full story.
BengaluruHennurBagalurRailwayRoad Construction


