36 Defects Found During Safety Inspection of Pink Line Metro Route
Safety inspections of the Pink Line Metro route, awaiting inauguration, have revealed 36 defects. Due to these findings, the opening of the pink metro line is likely to be further delayed. The Commissioner's report, submitted on October 9, requested that BMRCL submit technical documents and compliance reports for 36 key points before public operation can be permitted.
Originally reported by Asianet Suvarna News
Summarised from the source’s public news feed without altering the facts. Read the original report for the full story.
BengaluruNamma MetroInfrastructureMetroSafety


